If the only thing you have after ten days of a software build is a status update, you have a problem. Not necessarily a failing project, but one you can't yet tell apart from a failing one. A status update is a description of work. What your dev studio should show you in week two is the work itself: something you can open, tap, and break.

We run our projects this way at orithLabs, including Crumb Count and Kompete, and the reason isn't process purity. It's that non-technical buyers have almost no other way to tell a healthy build from a stalling one before the first invoice milestone lands. Here is the checklist we hold ourselves to, written so you can hold any studio to it.

The Week-Two Checklist: Three Things You Can Touch

By day ten, a studio that is actually building should be able to put these in front of you. Not describe them. Show them.

1. A running build on a real device

Not a screen recording, not a slide deck of designs, and not a simulator on the developer's laptop that only they can see. You should be able to install the app on your own phone, or be handed one, and tap through it.

It will be rough. Screens will be unstyled, some buttons won't do anything, and the data will be fake. That is fine. What matters is that the skeleton exists: you can move from screen to screen, and the core flow of your product is at least outlined. For a Flutter app, this means a build delivered through a test channel (TestFlight on iOS, an internal track on Android) that you can install without a developer standing next to you.

Why a real device matters: simulators hide problems. Performance, permissions, camera access, notifications, and screen sizes all behave differently on actual hardware. A studio that only demos on a simulator is deferring risk, and that risk comes due later, usually at the worst time.

2. A staging backend you can reach

Most apps are more than the screens. There's a server behind them holding accounts, data, and business rules. By day ten, there should be a staging environment: a private, working copy of that backend, separate from anything customers will ever use.

You don't need to understand it. You need to be able to ask three questions and get plain answers:

  • Is the app on my phone talking to it, or is it still using fake data?
  • Can I see a record I created in the app show up on the other side (in an admin dashboard, or even a simple database view)?
  • Who has access, and where does it live?

If the answer to the first question is "not yet, the backend comes after the frontend," that's not automatically wrong, but ask when it will be connected and what changes if the connection reveals a problem. Backend development and the app are two halves of one thing, and the expensive surprises live in the seam between them. Connecting them early is how you find those surprises while they're cheap.

3. A written scope-change log

This is the artifact people forget, and it's the one that protects you most. By day ten, you will have asked for something small that wasn't in the original plan. Everyone does. ("Can the login also support Google sign-in?") The question is what happened to that request.

A healthy studio keeps a running, written log: what was asked, who asked, what it affects, and whether it changes the timeline or cost. Even if the log has two entries, or zero, that's informative. A log that exists and is honest means you will never be handed a surprise bill that begins with "well, that wasn't in scope." A studio with no log is a studio where scope is negotiated from memory, and memory favors whoever is sending the invoice.

How to Tell a Stalling Software Project Early

None of the above requires technical skill to check. What it requires is asking for it, and noticing how the answer feels. These are the patterns we'd watch for if we were on your side of the table:

  • "It's mostly done, we just can't show it yet." Software that exists can almost always be shown in some form. Work that can't be demonstrated at day ten usually isn't as far along as described.
  • Demos only ever happen on the developer's machine. If you never get hands on it, you're trusting a performance rather than inspecting a product.
  • Design files but no code. Mockups are valuable, but they're not progress on the build. Ask to see both.
  • Status updates get longer while the artifacts get fewer. Detailed prose about "architecture decisions" with nothing installable is a warning sign.
  • Vague answers about what's been built versus what's planned. A good studio can say plainly, "this works, this is stubbed, this hasn't been started." If everything is described as "in progress," ask which parts you could actually use today.

That last point is the one we care about most. Candor about what has and hasn't been built yet is the single best predictor of a project that ends well. Any build has stubbed pieces at day ten. The healthy ones label them.

Why This Matters Before the First Milestone Payment

Most client contracts tie payment to milestones. That's reasonable, but milestones are often defined loosely ("core features complete"), and by the time a milestone is due, you've already spent weeks of calendar time. Checking at day ten gives you an early read with real leverage: if something is off, you can raise it while the fix is a conversation, not a renegotiation.

This applies whichever route you're on. If you're comparing outsourcing software development against hiring in-house, the same test works on both: a new engineer you hired should also be able to show you something running by the end of their second week. If you're weighing a freelancer against a studio, ask the same questions of each. And if you're trying to unstick a build that's already stalled with another team, these three artifacts are also a good way to find out what actually exists before deciding whether to continue, rewrite, or commission a code audit.

One honest caveat: not every project can produce all three on day ten. A build that depends on a third-party approval, a long data migration, or hardware may legitimately be behind on one of them. The test isn't whether every box is ticked. It's whether the studio can explain, specifically and without defensiveness, why one isn't, and show you what they have instead.

What We'd Suggest You Do Next

If you're about to sign with a studio, add a line to the agreement: a running build on a real device, a reachable staging backend, and a written scope-change log, all available by the end of week two. A good team won't blink at it. If you're already mid-project, ask for those three things this week and see what comes back.

At orithLabs, this is simply how we work: you have direct access to the engineers building your product, and you can install the app and see where things stand without waiting for a report. If you'd like a second opinion on a project that feels stuck, or want to talk through what a sensible first two weeks should look like for yours, we're happy to have that conversation.